AYNAVALVE
Around the world, Your best selection for high quality ball valves !   
  Kmc has been providing with a very strict quality program for several kinds of industrial ball valves for 7 years.Having a good reputation as a leading trader or/and exporter using the most modern production facilities, Ayna aims at maintaining the highest quality, the best price and delivery on time.
INTRODUCTION
COMPLY WITH APPLICABLE STANDARDS AND SPECIFICATIONS :
  Kmc valves are designed and manufactured to the international standards in full compliance with API 6D / ANSI / MSS / ASTM / NACE / DIN / BS / ISO / JIS / KS etc.
SATISFY CUSTOMER'S
EXPECTATIONS IN QUALITY :
 The global technology center and engineering core for quality control ! AYNA's quality control and "Qualicheck" procedures are desigend to be customer requirements. Clarification of specifications and/or testing, inspection will be defined by the end-users. AYNA will confirm
that all applicable specifications are followed in satisfaction. From ordering raw materials up to shipping out, all the precedures are under controled by our quality control program strictly.
To ensure the superior products, AYNAimplements the necessary conditions according to API 6D & 9001 basically.
AYNA is looking for having a good opportunity throughout this pre-qualification. Do not hesitate, any questions or any enquiries would be very appreciated. Contact us once, keep this file on your desk for up-coming business.
PROVIDE AVAILABLE AT
COMPETITIVE PRICES  &
DELIVERY ON TIME.

   AYNA will propose within customer's guidelines to offer the best possible prices on all products offered. Accordingly engineering companies or construction companies are able to save the budget or project evaluation to win in the bid. AYNA will guarantee the offered prices
validity although the exchange rates or materials cost impacted in the period. AYNA is willing to work on reasonable margins, dependent upon customers order volume, additional work requested,available finance options, and any additional, practical considerations.         Delivery is the essence of the contract ! The delivery date suggested in the quotation means the estimated time of the departure from factory location. AYNA will offer a best delivery time to meet enduser's demand. Within 7 days    after placing order, the relevant drawings will be
submitted for final approval. Most of the patterns or/and designs are well furnished all through experiences for 7 years. It helps to reduce the heavy preparations for several kind of each different specified items.   

AYNA will use the latest edition of the specifications listed in the end-users' BM section through out enough experience in oil, gas, chemistry industries. AYNA will be glad to follow any specifications that customer's request(some additional options may require an additional and fair charge). In the event that drawings, manuals, and/or specifications, ITP are necessary for the correct completion of a job, and those documents can be provided.      

ORDER PROCESSING    
 Upon receipt of an order for manufacture, sales department will prepare and deliver to administration to issue a work order folder and
then will submit the relevant report or documents as the followings.        
a.
Qualichek Spec Data Sheet to Buyer and All Internal Dep't. b. Proforma Invoice as Order Confirmation to Buyer.        
c.
Work Order Sheet(WOS) to All Internal Dep't.        
d.
Full Set of User's Specifications to Internal Dep't.         
e.
General Assembly Drawings with Sectional Description to Buyer.        
f.
Technical Meeting Report to Internal Dep't.        
g.
Expected Production Schedule Table or Shipping Schedule to Buyer.

   Prior to shipping, the packing slip with the valves will be checked to be certain that the information provided matches the information on the customer's purchase order. If this discrepancies are found, the customer will be contacted and the correct information will be obtained to repair or replace the valve.   
CONSIDER WHEN BUYING BALL VALVES
* Dependable High Quality *
* Competitive Price *
* Quick Delivery *
DOCUMENTATION
 The type of inspection documents to be supplied to the principal shall be as specified in the purchase order contents. KMC will provide
full documentation which shall be available prior to  shipment to buyers. Computerised data or photo-copies of originals(Verified and signed by the quality assuranc or quality control
dpartment) may be provided instead of originals. Not only test and inspection or material certificate documentation but also packing list & invoice will be presented at least 3 days before shipment from factory warehouse. KMC's documentation shall include the following contents to fill in
compliance with order.
1
. Purchase order and identification of the valves by its own serial.
2.
Material test reports and inspection certificates as per specifications.
3.
Non Destructive Examination report including drafts.
4.
Full set of general assembly drawings with its parts' description.  
5.
The others : Warrantee or guarantee letter, installation or/andoperation, maintenance manuals, relevant catalogues etc.
Witness or third party inspection reports or/and shipping release notefrom forwarder.               
Offshore Platform
District Heating
Shipbuilding
Oil Production Module
AYNA
Copyright © 2007 “AYNAVALVE”   All rights reserved.                                                                                                                                                                                         Powered by Sabah
Rambler's Top100